Heavy Duty High Speed ​​Pile Driving Crane

Ürün Özellikleri

Ürün Açıklaması

Description

  • When installing the heavy hammer, the heavy hammer should be carried 2m in front of the guide of the foot of the pile frame.

  • Operators must wear seat belts when working at heights.

  • While the pile driver is operating, no one is allowed to get under the lifted hammer.

Heavy Duty High Speed ​​Pile Driving Crane