Heavy Duty High Speed Pile Driving Crane
Ürün Özellikleri
Ürün Açıklaması
Description
When installing the heavy hammer, the heavy hammer should be carried 2m in front of the guide of the foot of the pile frame.
Operators must wear seat belts when working at heights.
While the pile driver is operating, no one is allowed to get under the lifted hammer.



